Chinese
News
Location: Home >  News > News > PT.General?Energy Bali
PT.General?Energy Bali
Author:Huadian EngineeringPublishDate:2019-04-26 16:29:15

The construction of Bali Power Plant was commenced in 2012 and the Commercial Operation Date was achieved on  September 23, 2015. Since the commissioning of the plant, it has been economically, safely and stably operated with expected operation index and business indicators. The plant has an average annual power generation of about 2.9 billion kWh and contributes near 40% power supply of Bali Island. It is a perfect solution with unprecedented stability, reliability and efficiency  to the power shortage that had long endured in Bali Island.